Building R.Shea Brewing: Week 3, Aug 18-24, 2014
Building a Brewery
Building R.Shea Brewing: Week 3, Aug 18-24, 2014
Aug 29, 2014
Keys and doors
There was some good progress made during this week. I got handed the keys to the place and to my delight, the 40" door was being installed. Standard doors are 36" wide. My equipment is a little smaller than this but not by much so it leaves no room for error when getting it into the place. The fermentors that need ordered are a little shy of 36" so I definitely needed a bigger door so that I don't bang any shiny stainless.
Utilities transferred!
I spent a good hour on hold with various companies getting the utilities transferred (water, gas, electricity). It was easy enough though.
Bonds
In week two I mentioned the brewers bond that I was working on - this is to essentially ensure the feds that taxes will be paid. I finally got that information and it ended up being more paperwork than I could immediately turn back around as I had to prepare some items (sigh, another week...). I was able finally get that information back to my insurer end of last week. Supposedly it has a quick turnaround and then I can complete and submit the entire application along with the state license.
Shandy development
After drinking an extensive array of Shandys this summer, I know what I want to brew. So last weekend my wife and I extensively trial-and-errored several formulations and came up with a few that I love. Not as sweet as most Shandys, a fruit that is used less, and still having a nice balance of tartness and hop bitterness so that you know it's a beer and not a malt beverage. They are good! We fine-tuned the formulations on assistant brewer Jesse and Daniel.
Food development
I love barbeque and love to grill it and have been doing so for years. My wife started development of our pork BBQ sliders and have narrowed it down to three recipes. A sweeter recipe, a spicy tangy recipe and a delicious Hawaiian recipe which has a home-made sauce. My wife also worked on home-made coleslaw to eat on it's own and also put on the sliders. It's very good. I love a good slaw. We chose pork sliders as they are easy to prep, only requires a crockpot and can can have it ready-to-serve in the evening. Any bartender can easily assemble one. The next step is to actually make our own sauce for the first two recipes.

Trying out the new bar…which will be coming soon…Jesse had a bad day from the looks of it….got up too early to brew…
What next?
The following week I will be hanging dropcloths on the windows with some logo's and 'coming soon' text - maybe even a tap list. I hope to have a bond by then and finishing up the federal paperwork. Hope. I am finding every 'next step', adds another delay. I plan to start taking out some of the current furnishings (tabletops, counters, etc) and clearing the space for the floorplan I need. Some tile has to come out too for the brew area.
I also plan to finalize the fermentors I need and place an order very soon!
-
The Journey
- Building R.Shea Brewing: Week 2, Aug 11-17, 2014 (previous post)
- Building R.Shea Brewing: Week 4, Aug 25-31, 2014 (next post)
We have the perfect party room waiting!
Contact partyroom@rsheabrewing.com and ask about our party space and catering menu... perfect for parties of 40-70 people. And you can’t get any closer to great beer and food!