The time had come.  Nearly nine months after signing the lease, enough systems were online and licenses approved that it was time to brew the first beer on the new brew system.

Now, know that this represents a 6x scaleup from what I was doing in the Florida room of my house.  I had to choose a recipe that I REALLY knew the taste of, and not necessarily a popular style.  I had to choose a lighter beer with less hops as to not mask any undesirable flavors.  Besides that, I had to start yeast-culturing for these big batches - something which I never really had to do.

A lot was riding on this batch being that it costs 6x as more too - so lot's of variables on this first scaleup.

I chose my Amber recipe, which is the most tweaked recipe that I have and one that I know the flavor profile intimately.

We ran into delays the minute we tried to get our initial 70 gallons of water ready.  How are we gonna measure 70 gallons?  The boil kettle and hot water tank have site-glasses, but I never calibrated them.  So John, Jesse, my Dad and my wife filled and emptied five gallon buckets of water into the kettles while I marked it off on the site-glass.  This took awhile...we had to do this for 120 gallons - or 25 times.  But after that, the brewday ended up being a four hour comfort cruise...


 

20150329_101925

Calibrating the brew kettle.

20150329_132732

Mash in! I need a canoe paddle – this one is too short.

20150329_143320

Starting the recirculation of the mash.

photo
20150329_143727

Setting up the site-glass for the recirculation.

20150329_162120

Sparge starting. Working perfectly so far.

20150329_170411

Getting the hops ready for the boil.

20150329_175032

About to open the mashtun for cleanout – sooooo much easier than the homebrew way of scooping it out or lugging a heavy kettle full of spent grain.

20150329_175235

Cleaning out the mashtun.

20150329_175318

The grain bed. If anybody needs spent grain for livestock, just contact me.

20150329_175321

A closer look.

20150329_175542
20150329_180016
20150329_181203

Waiting for the wort for boil.

20150329_191849

Getting ready for pumpout to the fermentors.

20150329_194608

It’s a longer way to the fermentors unlike homebrewing.

20150330_084938

Propagated yeast that I started growing about four days before brewday.

I have to thank homebrewdads.com yeast calculator for helping in the yeast scale-up.

20150330_084348

Collecting yeast from the fermentor of a prior batch.

20150330_084529

Repitching yeast from a prior homebrew batch of pale ale.

20150330_085723

Adding yeast to the beer…from a ladder!

The brew day ran too picture-perfectly.  Everything that I had planned for months worked seamlessly - Jesse and I even got a little bored.  I was tempted to spill something.  We also increased the efficiency on this system so we can use even less grain for the same amount of beer.

There is still a lot to do on the brew system to get it ready for primetime, but this first real brew allowed us to see what we still needed to do, where the spills are, what plumbing needs changed, etc.

Thanks!

Jesse and Rebecca, John, my Dad, my wife and Daniel.  We hope to have a few future sessions open up to a few more of the 'usual suspects' soon as I get a few more things in order.

Hosting an event?

We have the perfect party room waiting!

Contact partyroom@rsheabrewing.com and ask about our party space and catering menu... perfect for parties of 40-70 people. And you can’t get any closer to great beer and food!

Find out more...